Electrical installation across two live university buildings, delivered on time and on budget around a constraint that could not move.
The project
Two teaching labs at the University of Leeds. A full refurbishment of an existing lab and a new build in an adjacent building, running simultaneously. IJL Electrical Services carried the electrical package across both, covering containment, lighting control, small power, lighting, monitored emergency lighting and full testing across a six-month programme.
On paper, two teaching labs side by side. In practice, something considerably more demanding than that.
The constraint that changed everything
Universities do not stop. Teaching continues, research runs and in this case, a nearby research lab was operating equipment so sensitive to vibration that it sat on a continuous cushion of air. Not metaphorically. The equipment floated, held stable by a constant air supply, because even the faintest vibration would compromise the work being done.
Cut the power and the equipment drops. The research stops. Work that cannot simply be restarted from where it left off.
That single fact shaped every planned shutdown across the six-month programme. The windows available to IJL were limited, fixed and non-negotiable. There was no flexibility to extend a shutdown because the work ran long. There was no option to reschedule if preparation was not complete. Each window opened, the work went in and the window closed. That was the reality on site from day one.
Working in a live environment
Both buildings remained in active use throughout the programme. Teaching continued. The university did not pause while the electrical installation went in around it.
That kind of environment does not forgive poor planning or slow decision-making. It requires an electrical contractor who understands this before they start, not one that learns it the hard way at the expense of your programme. IJL sequenced work across both buildings simultaneously, coordinating the refurbishment and the new build without allowing activity in one to create programme pressure in the other. Planned shutdown windows were prepared for and used fully. No window was wasted and no shutdown overran.
The result
The project completed on time and on budget. G&H had a clean handover. The university’s teaching programme was not disrupted.
If your next project has a constraint that cannot move
Some electrical packages are straightforward. Some are not. When the site has a live environment, a fixed shutdown window or a single point of failure that the whole programme has to be built around, the electrical contractor you choose matters more than the price they quote.
If you have a project with that kind of complexity, talk to IJL.